1994

Establishment of the International Company "Antares"

1999

The design of electron-beam guns began

2003

Melting of the first titanium ingot

2006

“Construction of an office building”

"The construction of an administrative building with the reconstruction of the wall of the main facade of four premises of the lost landmark of local significance on the street. Lipskaya, 10 »

 
2010

The construction of the object "Construction of a residential house with an underground auto parking" is completed.

The construction of the object "Construction of a residential house with an underground auto parking, buildings A and B on Institutskaya street, 18 in the Pechersky district of Kiev. " The Certificate of Conformity КВ 000138 was accepted and received.

The construction of the object "Construction of a residential house with an underground auto parking, buildings A and B on Institutskaya street, 18 in the Pechersky district of Kiev. "

Information:

  • Number of apartments (block A and B) - 126 apartments - 27 649.2 m2;
  • The number of floors of block A - 22 floors;
  • Block B - 9 floors;
  • The area of ​​built-in and attached buildings is 1273.3 m2 (including boiler room, offices, fitness center, beauty salon, cultural entertainment block)
  • The area of ​​underground auto parking at 183 m / m - 7776 m2
 
2011

The construction of the complex "Fruit storage facility" has been completed.

The construction of the facility "Fruit storage complex in the State Reg. Vasilievka of the Tyvrovsky district of Vinnytsia region ".

Information:

  • Power - 17700 t
  • Number of storeys – 1 floor
  • The total area of ​​18 921.5 m2
 
2011

Arrangement and reconstruction "Preschool and school institution"

The work on the first line on the object was completed. "Preschool and school institution. Stolichnoe highway, Goloseevskiy district, Kiev. I stage of the construction. Construction and reconstruction of engineering networks, gas supply and heat supply, energy supply, water supply and sanitation ".

Information:

  • The motorway is 1,108 km wide with lighting (21 pcs of metal supports)
  • The area of ​​sidewalks is 1700 m2
  • The length of the medium pressure gas pipeline is 0.805 km
  • The total length of the gravity collector d. 250 mm - 1444 m
  • The total length of the double-wired 10 kV lines of the underground gasket is 17,175 km
  • Length of telephone sewerage - 3.68 km
  • Radiocommunication - 3.7 km.
 
2016

The object "Construction of a farm for breeding fish" was built and put into operation

An object "Construction of a farm for breeding fish in the administrative boundaries of the Okonsky village council (outside the village of Okonsk) of the Manevitsky district of the Volyn region" was constructed and put into operation.

Put into operation:

  • Pools for fish breeding trays No. 1 - an area of 8120 m2 capacity - 300 tons per year;
  • Small incubator - 540 m2, capacity - 5 million fry per year;
  • The incubator is large - 2620 m2, capacity - 15 million baby fish per year;
  • Compressor stations No. 1, No. 2 power - 72 m3 per hour;
  • Power supply line;
  • Transformer - power 1260 kVA.
 
2017

Gas Supply to Metallurgical Enterprises of Ukraine